培育視障信徒靈命.帶領視障人士歸主。

APR to MAY 2025

May 26, 2025

APR to MAY 2025

Remove all artificial ceilings in the centre and demolish the affected wooden walls.

The Housing Authority replaced leaking pipes, repaired peeling ceilings, and installed sprinkler systems.

Prev Post

Next Post